Study

Green development and productive capacity

The PCP recognises China’s contribution to the development of clean-energy manufacturing and related infrastructure as a significant field of learning. Ecological objectives become practical when research, equipment production, networks, skills and investment are connected. The Party studies these relationships through identifiable technologies and programmes.

Solar photovoltaic fields in Dunhuang, Gansu province, China.Photo credits

How the mechanism works

A transition needs reliable supply and the ability to manufacture, install and maintain equipment. Evaluation should include material use, operating conditions and replacement. Public policy can coordinate these requirements and give institutions a clear account of the capabilities to be developed.

Application within Swiss institutions

For Switzerland the PCP proposes coordinated energy and industrial investment, dependable networks and transparent renovation programmes. Cooperation with China should address defined technical or research questions. Public objectives should be assessed alongside service reliability, household costs and training needs.

The Party’s position

The PCP supports secure, accessible energy and a sustained reduction in environmental damage. Public coordination should bring generation, networks and efficiency investments into a coherent programme. Household costs and industrial needs belong in the assessment. Workers need training and continuity when technical changes alter their occupations.

Proposed measures

  • Coordinate generation, network and storage programmes.
  • Prioritise maintenance and efficient use alongside new capacity.
  • Support building renovation with transparent costs.
  • Plan training for affected occupations.
  • Assess clean-energy cooperation with China.
  • Publish assumptions about reliability, seasonal demand and household costs.

Assessment of results

  • Supply reliability and seasonal adequacy.
  • Whole-system and household costs.
  • Energy use and environmental effects.
  • Completion of investments and training.

Sources and further reading

Continue reading